End-to-End Factory Fit Out for a Major Ingredients Producer

End-to-End Factory Fit Out for a Major Ingredients Producer

Client:Duration:Location:Value:
Kiril Mischeff22 WeeksHolme Farm, SwinesheadUndisclosed

Overview & Objectives

Ambrey Baker was appointed as principal contractor for a full strip-out and rebuild of an existing processing space at Holme Farm. The project involved the delivery of a food-safe environment fit for high-care food production, complete with new mechanical and electrical systems, hygienic finishes and specialist installations.

Scope of Work

  • Full internal demolition and safe strip-out of redundant services

  • Food-safe wall, ceiling, and door systems throughout

  • Heavy-duty resin flooring with stainless steel drainage

  • Bespoke fit-out of blast chillers and ovens, including associated services

  • Cleanroom-standard corridors, lighting, and control installations

  • External façade upgrades, roofing improvements, new guttering and rainwater drainage installations, and a new canopy over the goods-in area

  • Access zone works and perimeter groundworks

  • New external concrete slab at goods-in

Challenges & Solutions

Live Site Coordination

The facility remained operational in adjacent areas throughout construction. Our team implemented strict segregation zones, sealed partitions, and staged delivery to eliminate production disruption.

Thermal & Hygiene Controls

To meet the client’s hygiene and temperature-critical processing needs, we installed:

  • Insulated food-safe panels

  • Crash-resistant chiller doors with temperature control systems

  • Extraction canopy with stainless steel fire-suppression pipework

  • Plug-and-play electrical power units for production line flexibility

Drainage & Cleanability

Custom resin flooring was laid with seamless coving and integral stainless-steel drainage. Washdown areas included kerbing, hose reels, and boot wash systems to ensure hygiene compliance.

Compressed Programme

With just 22 weeks on site, our team worked around the clock with parallel trades and phased inspections. All M&E and structural works were carefully coordinated using real-time scheduling.

Outcomes

Ambrey Baker delivered a high-performance, hygienic, and temperature-controlled production environment, suitable for fresh food preparation and downstream packaging operations. The upgraded facility now provides long-term durability, high cleanability, and compliance with food industry standards.

Related Case Studies

Transforming a Warehouse into a State-of-the-Art Food Factory
Capital Projects 5 June 2024

Overview & Objectives Project Parrot was a large-scale industrial transformation project undertaken by Ambrey Baker Construction, repurposing an aging warehouse into a modern, high-tech food...

Facility Transformation for Enhanced Production
Capital Projects 16 April 2025

Project Background Different Dog is an innovative pet food company based in Telford, focused on delivering freshly cooked, all natural pet food. With rapid growth...

State of the Art -22°C Cold Store Construction
Capital Projects 19 June 2025

Different Dog is an innovative pet food company based in Telford, focused on delivering freshly cooked, all natural pet food. With rapid growth from a...

Skip to content