Facility Transformation for Enhanced Production
Download Case Study
Project Background
Different Dog is an innovative pet food company based in Telford, focused on delivering freshly cooked, all natural pet food. With rapid growth from a small startup to a robust team of 90 professionals, they needed a state-of-the-art facility to support their expanding operations. Ambrey Baker Construction was tasked with transforming their existing space into a modern kitchen and production hub.
Scope of Work
Drainage System: Designed and installed a highc apacity drainage system, integrating durable piping through reinforced concrete, and conducted CCTV inspections for quality assurance. A new manhole was added to facilitate maintenance.
Cold Storage: Constructed cold storage units with custom-built insulated panels, food-safe silicone seals, and hygienic cladding, ensuring the safestorage of ingredients and products.
Temporary Facility: Developed a temporary facility with designated hand-wash areas, wash zones, and ingredient preparation rooms to maintain production during renovations.
Logistics Enhancements: Installed doors, ramps, and PVC curtains for better hygiene and operational efficiency.
Future-Proofing: Laid the groundwork for Phase Two, which will include expanding the mezzanine floor for office spaces and reconfiguring existing areas for increased functionality.


















“Our work with Different Dog has been a remarkable example of how thoughtful design and tailored solutions can make a significant impact on operational efficiency and growth. We’re proud to be part of their journey, ensuring that each phase of development is built on quality, compliance, and innovation to support their ambitious goals.”
Challenge: Insuring the drainage system could handle high production volumes.
Solution: Conducted thorough inspections and customized the piping and drainage layout for optimal capacity and durability.
Challenge: Aligning construction timelines with operational demands.
Solution: Phased the project strategically, completing Phase One to support immediate needs and planning Phase Two for future enhancements.
Challenge: Exceding requirements of food-grade construction standards.
Solution: Collaborated closely with Different Dog’s team and sourced specialised materials like food safe cladding and silicone seals, ensuring compliance with industry regulations.
Related Case Studies

Overview & Objectives Project Parrot was a large-scale industrial transformation project undertaken by Ambrey Baker Construction, repurposing an aging warehouse into a modern, high-tech food...

Ambrey Baker was contracted to reinforce the roof structure at GXO’s Peterborough facility to support the additional weight of a new solar PV system. The...

At Ambrey Baker, we take pride in contributing to the success of esteemed clients, and our recent collaboration with Melton Foods on a comprehensive facilities...