End-to-End Food Factory Build and Fit Out

End-to-End Food Factory Build and Fit Out

Client:Duration:Location:Value:
Ferndale Foods (Oscar Mayer)20 WeeksErith, LondonUndisclosed

Overview & Objectives

Ambrey Baker was appointed as principal contractor to deliver a new-build food manufacturing facility for Ferndale Foods, part of the Oscar Mayer Group. The project included full civils, steel frame erection, a robust mezzanine floor, and floor-to-ceiling cladding.

The objective was to provide a high-specification food production environment, designed for durability, efficiency, and compliance with the strict standards of the UK food industry. Unlike many of our projects, this was not a live operational environment, allowing the works to progress smoothly without impacting ongoing production.

Scope of Work

  • Civil engineering works, including foundations, drainage, and external groundworks
  • Full structural steel frame supply and installation
  • High-load mezzanine structure with concrete deck
  • Floor-to-ceiling food-safe insulated cladding system
  • External building envelope and roofing package
  • Food-safe wall, ceiling, and door systems
  • First fix mechanical and electrical infrastructure to support future process equipment

 

Challenges & Solutions

Precision Engineering
The mezzanine structure required exact tolerances to safely accommodate food manufacturing loads. Our engineers delivered a perfectly level finish using laser-controlled installation techniques, ensuring strength, safety, and long-term reliability.

Efficient Programme Delivery
Although not live, the programme was still tightly controlled. Careful sequencing of civils, steel erection, and cladding meant that trades could progress without interruption, reducing downtime and maintaining momentum.

Future-Ready Design
Oscar Mayer required flexibility for future production changes. The facility was built with open spans, clear headroom, and adaptable M&E infrastructure, ensuring the site can be reconfigured quickly as operational needs evolve.

Outcomes

Ambrey Baker successfully handed over a new-build food production facility, complete with mezzanine, hygienic finishes, and a durable external envelope. The completed building provides Ferndale Foods with:

  • A modern, efficient food manufacturing environment
  • Long-term operational durability
  • Flexibility for future expansion and reconfiguration
  • Compliance with food hygiene and safety standards

This project highlights Ambrey Baker’s expertise in food factory construction and fit-out, from civil works and steel installation to mezzanine delivery and food-safe cladding. The facility is now a valuable asset to Oscar Mayer’s UK operations, supporting large-scale, efficient food production.

RESOLVE COMPLEX INDUSTRIAL DESIGN OR CONSTRUCTION  CHALLENGES WITH CONFIDENCE.

For a no obligation initial consultation with one of the UK’s leading industrial construction and technical advisory experts, contact us today to gain clear, practical guidance on critical technical, engineering, and construction issues.

Paul Waldeck BEng(Hons), CEng., MICE., MIStruct.E, MIMech.E., MASHRAE,

paul.waldeck@ambreybaker.co.uk

Related Case Studies

End-to-End Factory Fit Out for a Major Ingredients Producer
23 September 2025

Overview & Objectives Ambrey Baker was appointed as principal contractor for a full strip-out and rebuild of an existing processing space at Holme Farm. The...

Transforming a Warehouse into a State-of-the-Art Food Factory
Capital Projects 5 June 2024

Overview & Objectives Project Parrot was a large-scale industrial transformation project undertaken by Ambrey Baker Construction, repurposing an aging warehouse into a modern, high-tech food...

Executing Critical Fire Separation Works Within a Live Pharmaceuticals Facility
Capital Projects 20 January 2026

Overview & Objectives This project involved the specification and installation of a 4-hour fire-rated internal wall within a live, fully operational pharmaceuticals warehouse. Delivered by...

Skip to content